Your holiday and investment
Invest, take rest, earn...
PL - apartamenty GB - apartamenty DE - apartamenty

Finishing standard

Number of storeys: • 3 overground + entresol,
• 1 underground.

Finishing technology:

• foundation of CMC column, reinforced spot footings,
• foundation walls - reinforced walls and concrete blocks and the post and beam construction,
• external curtain walling – SILKA blocks 24 cm,
• insulation– Styrofoam 18 cm,
• ceilings – hollowcore slabs,
• stairs – prefabricated,
• gable roof covered with tar paper.

The finishing works standard in common part of the building and the area surrounding constituting common part of the property:

• cellar – raw walls (without plastering), ceilings insulated and plastered,
• balcony – prefabricates.

Stairways:

• PVC windows,
• flight of stairs and landing– natural stone, granite,
• railing – steel, painted,
• walls – gypsum plaster,
• painting – emulsion paint,
• installations – lightning,
• doors – aluminum.

Elevation and outdoor elements:

• elevation – mineral painted plaster,
• window sills – coated sheet,
• gutters – galvanized painted sheet,
• release pipes – PVC.

Land development:

• entry and access roads, parking lots – paving blocks (Polbruk),
• undeveloped area - plated with grass + waste disposal facility.

Number of premises in the building: 24 residential premises (in case of joining or dividing apartments the number of premises may change) and 4 service units.

Number of garage and parking places:

• underground garage (including 31 parking places),
• outdoor parking places.

Available media in the building:

• central heating installation,
• cold water,
• sewerage system,
• electrical installation – network voltage 230 V and 400 V,
• intercom system,
• tv installation,
• internet network installation,
• lightning protection system.

Standard of finishing works in the apartment:

1. Apartment interior finishing elements:

• Leveling layer under floor, concrete on a Styrofoam of 5 cm,
• PVC windows, glass factor U = 1,1,
• Entrance door - reinforced,
• Surface of construction walls - machined gypsum plaster,
• Ceilings – machined gypsum plaster,
• Partitions of plasterboards of the ProMonta type (thickness 8cm) without door and window frames.

2. Installations in the apartment:

• Water system supplied to the apartment with cold water meter, without distribution,
• Sewerage system - plumb lines with t-connectors prepared for distribution,
• Electric installation distributed in the premises, domestic fittings (without lamps),
• Central heating installation,
• Mechanic ventilation,
• TV installation supplied to the apartment,
• Internet network installation supplied to the apartment,
• Intercom system supplied to the apartment - set.

Garage finishing standard:

• concrete floor,
• entrance gate,
• wall surface - concrete and calcium plaster, painted with emulsion paint,
• ceilings – insulation with mineral wool of 8 cm thick, secured with gasproof plaster,
• electrical installation - distributed in the premises.

665 109 671 biuro.dziwnowek@budnex.pl

We also recommend our investments in other locations:

Gorzów Wlkp.Zielona GóraPoznańSwarzędzSzczecin

Apartamenty na sprzedaż, Dziwnówek

Currently "BUDNEX" is the largest development company operating in Lubuskie Voivodeship and 12th developer in the Central and Eastern Europe in respect of the number of apartments built in the years 2008-2012. During the years of its activity the company completed over 8000 residential units and received many rewards and prizes related to its business activity.

Apartamenty nad morzem sprzedaż

We are a company with Polish capital and origin. We have been on the market since 1996 and since that time we have managed to develop a positive image among our customers. Presently, we are one of the most dynamic developer companies within Lubuskie and Wielkopolskie Voivodeship. We run our business in the field of construction within a family company.

Gazele BiznesuLubuski Lider BiznesuLubuski Mister BudowyDiamenty ForbesCIJIV Kamieński Powiatowy Konkurs Gospodarczy